Skip to main content
WATTMATRIX LAB BENCH // 230V 50Hz
☕
PLAIN-ENGLISH HOMEOWNER DECISION ENGINE

Household Energy Intelligence & What-If Simulator

Translates raw half-hour smart meter readings into plain-English financial decisions, vampire standby load disaggregation, and lifestyle scenario simulations.

100% Client-Side Privacy GuaranteedCRU & §216D TCA 1997 Statutory Compliant

Smart Meter Dataset & Active ProfileSample 1-Year Dataset Active

Upload your official ESB Networks HDF interval CSV, or explore with verified Irish household profiles.

Grid Profile:
WHAT-IF LIFE-EVENT SANDBOX

Simulate Life Changes On Your Meter Data

Inject synthetic high-draw appliances or work-from-home shifts in memory. Calculations update in real-time.

Disabled
15,000 km/yr
10,000 km20,000 km30,000 km
Annual EV Energy:2,700 kWh/yr
Wallbox Power:7.2 kW (32A)
Boost Slot Capture:100% in Super-Off-Peak
Disabled
2 days (Tue & Thu)
0d (Office)2d–3d (Hybrid)5d (Full Remote)
250 W
150 W (Laptop)250 W (Monitors)600 W (+Heating)
Added Daytime Import:+208 kWh/yr
Solar Self-Absorbed:0 kWh/yr
Battery Sizing OverrideAuto-Sized

Test specific lithium iron phosphate (LFP) module sizes against your household's peak and evening demand:

Usable Sizing:7.5 kWh
Net CapEx (€600 Grant Deducted):€4,400
Degraded Payback:6.8 years
Current Plan Financial Ledger (Annualized Basis)

Bord Gáis Energy — Smart EV Drive

€1,485net ongoing annual cost (inc-VAT)
Metered Duration365 daysFull-Year Basis
Annual Import4,520 kWhAcross 48 slots
Standing Charge€240.00Urban DG1
9% Domestic VAT€122.60Statutory Irish VAT
Section 216D CEG-€0.00Untaxed Microgen
Year 1 Net Bill€1,485Excl. Cashback
CORE AREA 1

The "Sleep" Bill (Vampire Standby Load)

24/7 Idle Draw
Annual Idle Standby Cost:
€318/yr(21.4% of total electricity bill)
Always-On Baseload
120 W(1,051 kWh/yr)
Continuous 120 W Baseload Detected (Above 80 W Target)

Your home maintains a continuous standby draw of 120 W while everyone is sleeping. This uses 1,051 kWh annually, costing approximately €318 per year (21.4% of your total bill).

Night / Sleeping Idle:€98/yr (31%)
Daytime Idle Standby:€220/yr (69%)
Rule of thumb: Each 50 W cut permanently saves ~€132/year.01:00–05:30 Sleep Floor
CORE AREA 2

The "Dinner Rush" Peak Penalty (17:00–19:00)

Weekend Surcharge Waived
Annual Peak Timing Penalty:
+€74/yrextra peak surcharge
Dinner Rush Energy Share
18.4%(+1.9% vs national avg)
High Peak Concentration: 18.4% Consumed in 2h Window

Your evening dinner rush accounts for 18.4% of your daily electricity (vs. 16.5% national benchmark). Running power during peak adds +€74/year in premium surcharges.

Shiftable 250-Cycle Appliance Savings:
🍽️ Dishwasher (1.5 kWh)Save €68/yr
Shift from 18:00 to 23:00 Night or EV Boost
🧺 Washing Machine (2.2 kWh)Save €100/yr
Shift from 17:30 to off-peak / EV timer
Total appliance shift arbitrage: up to €168/year250 Cycles Basis
CORE AREA 3

Rooftop Solar & Cylinders "Spilled"

Export For CEG (Oil Home)
Annual Combined Solar Value:
€892/yrcombined bill offset + CEG cash
Surplus Hot Water Equivalent
78cylinders / yr
Arbitrage Verdict: Exporting Earns +€48/yr More Than Diverter

A 4.0 kWp array in Dublin generates 3,900 kWh/yr. You would self-consume 46% and export 54%—enough surplus energy to heat 78 domestic 150L hot water cylinders from 15°C to 60°C.

Self-Consumed Bill Offset:€562/yr
Exported CEG Credit:€330/yr
Diverter vs. CEG Arbitrage Verdict:Exporting Earns +€48/yr More

At €1.05/L kerosene, oil heating costs 12.1c/kWh. Exporting untaxed under Section 216D earns 19.5c/kWh. Selling surplus to the grid yields 7.4c/kWh more than diverting into hot water!

150L cylinder sensible heat: 7.845 kWhSEAI Grant: €1,800
CORE AREA 4

Home Battery Storage Payback Horizon

Strong / Viable (< 7 yrs)
Year 1 Arbitrage Savings:
€650/yrannual peak-shaving benefit
Degraded Payback Horizon
6.8 yrsamortization
Recommended: 7.5 kWh Usable Capacity (6.8-Year Amortization)

Pre-charging a 7.5 kWh battery at 8.7c/kWh overnight to displace 45.8c/kWh peak and 32.7c/kWh shoulder demand saves €1.78/day (€650 in Year 1). After the €600 SEAI grant, net cost is €4,400 with a 6.8-year degraded payback.

Peak Arbitrage Spread:+36.1c/kWh (RTE 88%)
10-Yr Cashflow (2%/yr Fade):€5,915 saved
Net CapEx: €4,400SEAI €600 Grant Included
FIRST-PRINCIPLES CONSUMER FINANCIAL ENGINES

Statutory Capital Optimization & Market Risk Audits

Mathematical models for optimal solar sizing, CRU dynamic wholesale volatility, Section 216D €400 tax cliff, and 10-year degraded battery amortization.

CRU • SEMOpx • Revenue Part 07-01-44

Rooftop Solar Sweet-Spot Sizing (2.0–6.0 kWp)

4.0 kWp (9 panels)
Net Outlay (0% VAT):€5,200
Fastest Payback:5.4 yrs
Self-Consumption:64%
10-Yr Net Profit:+€3,480

Based on your daytime usage, a 4.0 kWp system offers the fastest payback knee.

⚠️ Diminishing Returns Above 4.0 kWp:The SEAI grant maxes out at €1,800 at 4.0 kWp (€0 marginal grant above 4 kWp).
SEAI €1,800 Grant • 0% VAT Supply-and-InstallJensen-Corrected

CRU Dynamic Wholesale Tariff Risk (SEMOpx)

LOW RISK
Expected Delta vs TOU:Save €65/yr
17:00–19:00 Peak Share:3.1%
SEMOpx Capture Factor:0.74
Worst-Case Winter Delta:+€22/yr

Low risk: Your usage concentrates in cheap overnight hours, insulating you from calm-winter peak spikes.

🛡️ CRU Retail Safeguard:Wholesale pass-through capped at 50c/kWh ex-VAT. All-in scarcity spikes bounded at ~75.8c/kWh incl. VAT.
Single Electricity Market Operator (SEMOpx)1-in-20 Cold Winter Stress Test

Section 216D TCA 1997 €400 Microgen Tax Cliff

Tax-Free Exemption Active
Gross Export Cash:€495/yr
Tax-Free Allowance:€400/yr
Case IV Tax Due (52.2%):€50/yr
Net Post-Tax Yield:€445/yr

Export earnings above €400 trigger Schedule D Case IV income tax, USC, and PRSI.

💡 Revenue Compliance Tip:Put two names on your electricity bill to double your tax-free allowance to €800/year (Revenue Part 07-01-44).
Schedule D Case IV • Form 12 / Form 11 ExemptionTCA 1997 §216D

True 8–10 Year LFP Battery Amortization

Unviable (> 10.0 yrs)
Net CapEx (0% VAT):€2,800
Year 1 Savings:€125/yr
8-Yr Return (2% Fade):€933
10-Yr Deficit / Gain:-€1,657

Factoring in 88% RTE and 2%/yr cell fade, low evening demand extends payback beyond the 10-year warranty.

⚡ Export Cannibalization Paradox:Charging overnight at ~8.7c while exporting daytime solar at 19.5c earns 3x more than storing solar at 88% efficiency!
88% RTE • 2%/yr Linear Cell DegradationWarrantied Life Model
DECISION LEDGER

Optimal Smart Tariff Comparison (Simulated With Your Data)

Ranked strictly by lowest ongoing net annual bill
ESB NETWORKS PORTAL GUIDE

How to Download Your ESB Smart Meter File

Free, official, and instant from ESB Networks. Takes less than 2 minutes.

1

Log in or Register at myaccount.esbnetworks.ie

Visit the official portal atmyaccount.esbnetworks.ie. If this is your first time, you only need your 11-digit MPRN (printed at the top of any Irish electricity bill, starting with 10...).

Sample Electricity Bill Header:
Account No: 884-219-01MPRN: 10309179540
2

Open “View My Energy Consumption” → “Download HDF”

From your ESB dashboard, click on “View My Energy Consumption”. Scroll down past the usage graphs to the export buttons, and click “Download Harmonised Downloadable File (HDF)”.

3

Choose “30-Minute Readings in Calculated kWh” (Best Option)

Select “30-Minute Readings in Calculated kWh” (HDF_calckWh_*.csv). This provides the granular 48 half-hour slots per day needed to audit EV Boost tariffs (2am–4am) and standby baseload.

Important Tip: Drop that CSV file straight onto WattMatrix! Do not open and re-save it in Microsoft Excel first, as Excel can alter date formats and drop leading zeros.
Waiting for ESB Networks registration or file access?